Stayton High School

Stayton High School

Willamette Valley Excavating is working directly with the North Santiam School District to reconstruct a new bus loop which consists of 3 new storm filtration swales and installing new curbs and asphalt around the bus loop and parking lot.  We installed a 24” diameter storm detention system and finished off the project with new striping and...

Power Equipment Systems

Willamette Valley Excavating was contracted to demolish existing concrete building pads, curbs and disability ramps for this property located in Salem, Oregon off of Tandem Avenue NE.  We installed a new storm line and catch basin and constructed a new parking lot drive lane.  Willamette Valley Excavating also did the preparation work for curbs and asphalt to be...
Toyota of Corvallis – Corvallis, OR

Toyota of Corvallis – Corvallis, OR

Toyota of Corvallis – Corvallis, OR Toyota decided to re-vamp their new Toyota dealership in Corvallis. They decided to remove everything, even the existing building, in order to construct a new dealership all while staying open. This scenario created complex schedules and deadlines. Willamette Valley Excavating was up for the challenge, though. We will be doing the prep work for the new AC, pavers and concrete, installing a new public sewer system, onsite detention system and building foundation prep. Search for:  ...
O’Reilly Auto Parts – Newport, OR

O’Reilly Auto Parts – Newport, OR

O’Reilly Auto Parts – Newport, OR This project was the construction of a new O’Reilly Auto Parts store in Newport, OR. We had to remove the existing building, install all new utilities, excavate and grade for the building foundation and excavate and grade for the parking lot and sidewalks. Search for:  ...